When a standard air handling unit does not fit the building, environment or process, Skawen develops a solution around the actual project conditions.
Project-Specific Air Handling for Unique Requirements
Some Projects Require a Different Starting Point
A special solution may be required when the project includes a combination of several technical restrictions that a catalogue unit cannot address at once.
- Unusual dimensions or unit configuration
- Restricted transportation or installation access
- Strict equipment-weight limitations
- High humidity or corrosive conditions
- Special temperature, pressure or airflow profiles
- Integration with existing systems
From Requirements to a Complete Concept
Skawen begins by evaluating airflows, temperatures, humidity, contaminants, energy sources, installation space, maintenance access and controls together. The unit is then configured according to the technical priorities of the project.
A Platform for Demanding Configurations
The lightweight and modular composite casing supports flexible dimensions, component arrangements and sectional delivery while providing corrosion resistance and reduced thermal bridging.
Bring Skawen Into the Project Early
Early cooperation between the customer, consultant, contractor and manufacturer helps identify possible configurations and interfaces before final procurement.
Useful initial information:
- Project description and objectives
- Drawings and available dimensions
- Required airflows and indoor conditions
- Environmental or process conditions
- Access-route dimensions
- Existing energy/automation systems and project schedule