Solution: Special Projects

Project-Specific Air Handling for Unique Requirements

When a standard air handling unit does not fit the building, environment or process, Skawen develops a solution around the actual project conditions.

Discuss Your Special Project
View References

Some Projects Require a Different Starting Point

When standard is not enough

A special solution may be required when the project includes a combination of several technical restrictions that a catalogue unit cannot address at once.

  • Unusual dimensions or unit configuration
  • Restricted transportation or installation access
  • Strict equipment-weight limitations
  • High humidity or corrosive conditions
  • Special temperature, pressure or airflow profiles
  • Integration with existing systems

From Requirements to a Complete Concept

Engineering approach

Skawen begins by evaluating airflows, temperatures, humidity, contaminants, energy sources, installation space, maintenance access and controls together. The unit is then configured according to the technical priorities of the project.

A Platform for Demanding Configurations

Flexible casing platform

The lightweight and modular composite casing supports flexible dimensions, component arrangements and sectional delivery while providing corrosion resistance and reduced thermal bridging.

Bring Skawen Into the Project Early

Early cooperation

Early cooperation between the customer, consultant, contractor and manufacturer helps identify possible configurations and interfaces before final procurement.

Useful initial information:

  • Project description and objectives
  • Drawings and available dimensions
  • Required airflows and indoor conditions
  • Environmental or process conditions
  • Access-route dimensions
  • Existing energy/automation systems and project schedule