Skawen develops corrosion-resistant, lightweight and energy-efficient air handling solutions for buildings and environments where standard equipment may not be enough. Our composite casing technology, flexible engineering and intelligent control solutions support demanding pool, residential, commercial and industrial applications.
Air Handling Designed Around the Project
Corrosion-resistant composite casing
Lightweight and modular construction
Project-specific configuration
Energy recovery and intelligent control
Start With the Building or Operating Challenge
Composite Casing at the Core
The composite casing is the foundation of Skawen air handling units and a central difference from conventional metal equipment. Its material construction provides corrosion resistance, low weight and reduced thermal bridging — supporting flexible dimensions, sectional delivery and installation where access or structural capacity is limited.
- Corrosion resistance for demanding environments
- Lightweight construction, reduced thermal bridging
- Good thermal performance
- Flexible dimensions and layouts
- Indoor and outdoor installation possibilities
- Modular or sectional delivery
More Than an Equipment Casing
Effective air handling requires coordinated engineering across airflow, temperature, humidity, energy recovery, heating, cooling, filtration and control. Skawen evaluates these requirements together and configures the equipment around the actual project. The Skawen controller and connected platform can provide system status, operating information, alarms and remote access according to the selected control scope.
Proven in Real Buildings and Operating Environments
From Project Conditions to a Suitable Solution
Share the requirementsSend available drawings, airflows and operating conditions.
Evaluate the projectSkawen reviews application, energy functions, space, access and control requirements.
Configure the solutionThe product family, casing layout, components and controls are selected.
Coordinate deliveryDocumentation, production, installation planning and commissioning responsibilities are agreed.









