We use cookies for website analytics (Google Analytics) and to see which companies visit our site (Lead Forensics). They are only set if you accept. You can change your choice at any time under "Cookie settings" at the bottom of the page. Privacy policy

Site logo
Sticky header logo
  • Solutions
    • Pool & Aquatic Facilities
    • Industrial & Corrosive Environments
    • Commercial Property & Renovation
    • Residential & Multi-Family Buildings
    • Special Projects
  • Products
    • Skawen Residential
    • SKW Recu
    • SKW Compact
    • SKW Ruar
    • SKW Roto
    • SKW Pool HP
    • SKW Compact Pool HP
    • SKW Greywater
  • Why Skawen
    • Composite Casing
    • Controls & Cloud
    • Service & Support
  • References
  • Support & Resources
    • Technical Resources
    • Service & Support
    • News & Insights
    • FAQ
    • Distributors & Partners
  • About
    • Our History
  • Contacts
  • English
    • Nederlands
    • Français
    • Deutsch
    • Español
    • Eesti
    • Svenska
Mobile logo
Sticky header logo
English
Mobile logo
Sticky header logo
English
English
Industrial

A Modern Industrial Ventilation Solution – Riga Mill Project (LV)

Prevskawen com project bertagnoli web 20240725 105605Efficient Ventilation renovation project for a Private Indoor Pool (AT)Nextarvojuhkov com photos narva vanalinna lasteaed img 7680Skawen Delivers Smart Climate Solutions for New Kindergarten in Narva (EE)

Project data

Project type: Food Industry
Key Project Details:
Location: Riga, Latvia.
Completion Year: 2024.
Industry: Food production – oat processing.
Ventilation Type: Industrial rooftop ventilation.
Installed Units: Two rooftop ventilation systems (Model SKW RUAR 10.10).
Airflow Capacity: 2x90,000 m³/h, among the largest in its class.
Energy Efficiency: 300 kW energy recovery from warm and humid process exhaust air.
Weight: Each unit weighs 4,600 kg, designed for long-term use.

Project description

The Riga Mill project is an innovative industrial ventilation initiative focusing on energy efficiency and durability in the food production sector. Located in Riga, Latvia, the project was completed in 2024. The facility processes oats, and its ventilation systems must handle challenging environmental conditions, including dusty, humid, and corrosive air.

Highlights and Solutions:

  1. Composite Casing:
    • Constructed with C4 corrosion-resistant material, the system withstands the humid, dusty, and abrasive air from oat milling processes, ensuring durability and reduced maintenance costs.
  2. RunAround Energy Recovery System:
    • Captures heat from the exhaust air and uses it to preheat supply air, achieving high energy efficiency.
  3. Installation Setup:
    • All ventilation units are mounted on the production building's rooftop at a height of 30 meters, optimizing space utilization and system performance.
  4. Optimal Air Pressure:
    • The system operates with a total pressure of 500 Pa, ensuring a balance between energy efficiency and ventilation capacity.

Impact and Significance

The Riga Mill project demonstrates how modern ventilation technology can meet the complex needs of the industrial sector. With its energy recovery capacity of 300 kW and high airflow capability, the system supports sustainable operations while adhering to the specific demands of food processing facilities.

This project is a testament to Skawen’s ability to deliver innovative engineering solutions, ensuring both environmental sustainability and operational efficiency.

Installation Process: Overcoming Challenges with Precision

The installation phase of the Riga Mill project presented several challenges due to the size and complexity of the equipment, the height of the installation site, and the specific demands of oat milling operations. The process required meticulous planning and coordination among different teams to ensure success.

Installation Highlights:

  1. Rooftop Setup at 30 Meters:
    • All units were installed on the production building’s rooftop at a height of 30 meters, requiring the use of specialized cranes and lifting equipment to handle the 4,600 kg units safely.
    • Precision was critical to position the units correctly within the limited space and to connect them seamlessly to the existing production systems.
  2. Customized Equipment Delivery:
    • The ventilation units were delivered in modular sections to accommodate transport limitations and rooftop access.
    • The modules were assembled on-site, ensuring they fit the production building's design and infrastructure.
  3. Handling Harsh Process Air:
    • The processed air in oat milling is humid, dusty, highly corrosive, and abrasive, which necessitated the use of C4 corrosion-resistant composite casing. During installation, special attention was paid to sealing and connecting components to maintain resistance to these harsh conditions.
  4. Coordination Among Teams:
    • The project brought together construction, ventilation, electrical, and mechanical engineering teams. Each team played a critical role in ensuring the successful installation and integration of the ventilation systems.
  5. Energy Recovery Integration:
    • The RunAround system, which recovers heat from the process exhaust air, was integrated during installation.
  6. Testing and Commissioning:
    • Once the units were installed, a comprehensive testing phase began. This included verifying airflow capacities, ensuring energy recovery efficiency, and calibrating the system to handle the harsh environmental conditions of oat milling.
    • The commissioning process ensured that the system met the project’s performance and efficiency targets.

The Riga Mill installation showcases how complex ventilation projects can be executed with precision and innovation. By combining robust equipment with careful planning, the project has transformed the facility into a model of energy efficiency and operational reliability, meeting the unique demands of the food production sector.

This successful installation highlights Skawen’s commitment to delivering tailored solutions that excel in challenging industrial environments.


Skawen-Riga-Mill-project in pdf for download

skawen com portfolio project riga riiga 1 edit edit
skawen com portfolio project riga riiga 2 edit
skawen com portfolio project riga riiga 3 edit
skawen factory img 20230912 114540 pano edit
skawen com riga mill loading img 20240510 141503
skawen com riga mill loading img 20240510 141403
skawen com riga mill loading img 20240510 141349 pano edit
skawen com riga mill loading img 7593 edit
skawen com riga mill loading img 20240510 142004 pano
skawen com riga mill loading img 20240510 143613
skawen com riga mill loading img 20240510 143155
this is from oneplus camera
skawen com riga mill loading img 20240510 142205
skawen com riga mill loading img 20240510 143014
skawen com riga mill loading img 20240510 143236
skawen com riga mill loading img 20240510 150544
skawen com riga mill loading img 7570 pano edit
skawen com riga mill loading vid 20240510 152033 1
skawen com riga mill loading img 20240510 155350
  • RigaMillProject
  • RigaMill
  • Energy Efficiency
  • Ventilation
  • Renovation
  • EnergyEfficiency
  • Skawen
  • Riga
  • Sustainability
  • Innovation
  • IndustrialVentilation
  • FoodProduction
  • EngineeringSolutions

Drop us a line or two, we are open for
creative minds and collaborations!

sales@skawen.com
Send project
Message Us
OFFICE
Sveavägen 116
1403 Stockholm Sweden
OFFICE
+46 702 263 293
info@skawen.com
SALES
+372 5665 4004
sales@skawen.com
SUPPORT
+372 5623 7005
support@skawen.com
About usAbout us
SolutionsSolutions
NewsNews
ContactsContacts
ImprintImprint
Privacy policyPrivacy policy
web and branding by Voolarweb and branding by Voolar
.gallery_single .dfd-inside-gallery-wrap {margin: -7.5px;}.gallery_single .dfd-inside-gallery-wrap > article > a.dfd-lightbox-link {display: block; padding: 7.5px;}#layout.single-folio > .row.full-width .dfd-content-wrap.dfd-portfolio_single > article.portfolio .media-section.twelve.columns .media-cover,#layout.single-gallery > .row.full-width .dfd-content-wrap.dfd-gallery_single > article.gallery_single .media-section .media-cover {padding: 15px;}#main-content .dfd-content-wrap {margin: 0px;} #main-content .dfd-content-wrap > article {padding: 0px;}@media only screen and (min-width: 1101px) {#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars {padding: 0 0px;}#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars > #main-content > .dfd-content-wrap:first-child,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars > #main-content > .dfd-content-wrap:first-child {border-top: 0px solid transparent; border-bottom: 0px solid transparent;}#layout.dfd-portfolio-loop > .row.full-width #right-sidebar,#layout.dfd-gallery-loop > .row.full-width #right-sidebar {padding-top: 0px;padding-bottom: 0px;}#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars .sort-panel,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars .sort-panel {margin-left: -0px;margin-right: -0px;}}#layout .dfd-content-wrap.layout-side-image,#layout > .row.full-width .dfd-content-wrap.layout-side-image {margin-left: 0;margin-right: 0;}
Co-funded by the European Union

Skawen Production OÜ development programme is co-funded by the European Union.

Read more about the EU co-funding

    I want

    We use your details only to answer your message. Privacy policy

    Tired of filling in forms? Email us.

    info@skawen.com

    This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.